Tank Farm Relocation Reaches a New Development Milestone
Transnet National Ports Authority has advanced plans to relocate liquid-bulk operations from the Port of Port Elizabeth to the Port of Ngqura, issuing a Request for Proposals for a new terminal under a 25-year concession.
The appointed operator will be responsible for funding, designing, developing, constructing, operating, maintaining and eventually transferring the facility. The planned terminal will include liquid-bulk storage tanks, road tanker loading gantries, pipelines and associated operating infrastructure within Ngqura’s designated Liquid Bulk Precinct.
Rather than simply adding capacity, the project represents a transition from older infrastructure toward a new-generation terminal designed around long-term operational requirements.
Greenfield Development Creates an Opportunity to Design for Integrity
Earlier TNPA planning identified the existing Port Elizabeth liquid-bulk facilities for eventual decommissioning as they approached the end of their design life, with new infrastructure at Ngqura intended to support the transfer of operations.
A greenfield terminal offers an opportunity to address lifecycle integrity before operations begin.
Tank foundations, floor protection, shell design, coatings, corrosion allowances, drainage, pipelines, loading systems and inspection access can all be considered during engineering rather than retrofitted later.
For terminal operators, designing for maintainability can reduce future inspection complexity and improve the ability to detect degradation before it affects availability or safety.
A 25-Year Operating Horizon Makes Maintenance Part of Design
The concession model places long-term performance at the centre of the project.
Storage tanks and transfer systems must remain reliable through decades of product movements, maintenance cycles and changing operational demands. Risk-based inspection, corrosion monitoring, digital integrity records and structured preventive maintenance can therefore form part of the terminal’s operating strategy from commissioning onward.
TNPA has also stated that the operator will be required to comply with relevant environmental, safety and regulatory standards, reinforcing the connection between infrastructure development and responsible terminal operation.





