Deepwater Drilling Returns to OML 138
The Nigerian Upstream Petroleum Regulatory Commission has announced that ExxonMobil and its partners are committing $1 billion to on-block activities for the Usan Infill Project in OML 138.
The project is expected to add approximately 40,000 barrels per day to Nigeria’s upstream production and marks a significant return to drilling activity within ExxonMobil’s deepwater portfolio.
Esso Exploration and Production Nigeria operates OML 138 under a Production Sharing Contract with NNPC Limited. Its co-venture partners include Chevron, TotalEnergies and Nexen, a wholly owned subsidiary of CNOOC.
According to NUPRC, ExxonMobil’s affiliate had not undertaken drilling operations in the area since 2016. The new commitment therefore represents more than an investment announcement. It signals renewed efforts to recover additional value from an established offshore asset.
Seismic Insight Becomes a Production Decision
NUPRC describes Usan as a short-cycle investment, with first production expected within 18 months after seismic data identified the opportunity.
This highlights the increasingly important role of reservoir data in production optimization. Seismic interpretation can help operators improve their understanding of reservoir structure, identify underdeveloped opportunities and support more accurate decisions around infill-well placement.
The objective is not simply to drill additional wells. It is to convert better subsurface knowledge into incremental production while reducing uncertainty, development time and avoidable capital exposure.
The proposed 40,000 bpd increase demonstrates why established deepwater fields remain central to Nigeria’s production-growth strategy. Faster production gains may come from improving recovery around existing assets rather than relying entirely on long-cycle greenfield developments.
Additional Barrels Depend on the Wider Production System
Short-cycle development does not mean simple execution. New wells must operate within the technical limits of the complete production system.
Reservoir behaviour, drilling performance, well productivity, subsea reliability, flow assurance, processing capacity and maintenance readiness will influence whether the expected volumes become stable production.
Operators must also determine how additional output will affect existing bottlenecks, equipment loading, inspection priorities and offshore operating continuity. A successful infill project must deliver more than first oil. It must sustain production without transferring reliability risks to other parts of the asset.
This is where production optimization, reservoir performance and asset reliability must be managed as connected disciplines.





